A Practical Cloud Migration Readiness Checklist
Before moving workloads to AWS or Azure, work through these questions on inventory, dependencies, identity, data, cost and operations to avoid the most common migration failures.
- Author
- Arabian Lynx Editorial
- Published
- 4 min read
Most cloud migrations that run into trouble do so for predictable reasons: an incomplete inventory, an undocumented dependency, an identity model added at the last minute, or a cost model nobody validated. All of them are planning problems, and all of them can be dealt with before the first workload moves.
This checklist is the set of questions we recommend working through before committing to a migration timeline.
1. Do you have a complete and current inventory?
You cannot migrate what you do not know exists. Build an inventory that covers, for every workload:
- Servers, operating systems and versions
- Databases, engines, versions and sizes
- Scheduled jobs, batch processes and file transfers
- External integrations (payment gateways, SMS providers, government APIs, partner SFTP)
- Licences tied to hardware, cores or MAC addresses
- A named business owner and technical owner
2. Have you mapped dependencies?
Workloads rarely move alone. Map which systems talk to each other, over which protocols, and how sensitive each path is to latency. A reporting database that sits 2 ms from an application on-premises may sit 30 ms away during a hybrid phase, and that can turn a fast report into a timeout.
Group tightly coupled systems into migration waves that move together.
3. Have you chosen a strategy per workload?
Not every workload deserves the same treatment. A common framework is:
| Strategy | When it fits |
|---|---|
| Rehost ("lift and shift") | Time pressure, stable workloads, limited change budget |
| Replatform | Small changes with clear benefit, such as moving to a managed database |
| Refactor | Workloads that need elasticity or are being actively developed |
| Retire | Systems nobody actually uses any more |
| Retain | Workloads with regulatory, latency or licensing reasons to stay put |
Being honest about the "retire" and "retain" categories usually reduces scope significantly.
4. Is your landing zone ready?
A landing zone is the foundation that every workload will inherit. Before migrating, confirm that you have:
- An account or subscription structure that separates production, non-production and shared services
- Centralised identity with single sign-on and multi-factor authentication
- Network design: address ranges that do not overlap with on-premises, connectivity (VPN or dedicated links), and egress control
- Logging and audit trails sent to a central, tamper-resistant location
- Guardrails (service control policies or Azure Policy) that prevent risky configurations
- Tagging standards for owner, environment and cost centre
Build the landing zone with Infrastructure as Code so it can be reviewed, versioned and reproduced.
5. Do you understand your data obligations?
For regulated sectors such as banking and payments, data location, encryption and access are not optional. Clarify with your compliance and legal teams which data classes can move to which regions, what encryption is required at rest and in transit, and who may hold encryption keys. Reflect those answers in the architecture before migration, not afterwards.
6. Have you built a realistic cost model?
Cloud costs depend on design choices. Compare estimates for right-sized instances rather than on-premises specifications, include data transfer and backup storage, and decide early whether commitments (reserved instances or savings plans) make sense for steady workloads.
Plan to review actual spend in the first weeks after each wave, when it is easiest to correct over-provisioning.
7. Can you roll back?
Every migration wave should have a documented rollback path, a decision owner, and a point after which rollback is no longer possible. Test the cut-over in a rehearsal environment. Make sure backups in the target environment have actually been restored, not just taken.
8. Is operations ready on day one?
The migration is not finished when the workload starts in the cloud. Confirm that monitoring, alerting, on-call responsibilities, patching processes and runbooks exist for the new environment and that the team operating it has been trained.
Before you commit to a date
A migration plan is ready when you can answer, for each wave: what is moving, what it depends on, which strategy applies, where it lands, how data is protected, what it will cost, how to undo it, and who operates it afterwards. If any of those answers is "we'll figure it out", that is where to spend the next week.
This article is general technical guidance and does not describe a specific client engagement.